• Golden PP Grid Cooling Tower Fill Hamon Filler
  • Golden PP Grid Cooling Tower Fill Hamon Filler
  • Golden PP Grid Cooling Tower Fill Hamon Filler
  • Golden PP Grid Cooling Tower Fill Hamon Filler
  • Golden PP Grid Cooling Tower Fill Hamon Filler
  • Golden PP Grid Cooling Tower Fill Hamon Filler

Golden PP Grid Cooling Tower Fill Hamon Filler

Cooling Method: Counter Flow
Ventilation Mode: Natural Ventilation
Air Contact Form: Wet and Dry
Air Contact Way: Open
Tower Shape: Square
Noise Level: Ordinary
Samples:
US$ 10/Square Meter 1 Square Meter(Min.Order)
| Request Sample
Customization:
Diamond Member Since 2019

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company

Basic Info.

Model NO.
9625
Application Fields
Industrial
Certification
ISO
Condition
New
Transport Package
Carton Box with Pallet
Specification
Customized
Trademark
LATINO
Origin
China
HS Code
3926901000
Production Capacity
10000 M /Day

Product Description

Golden PP Grid Cooling Tower Fill Hamon Filler

Cooling Tower Mist Eliminator For BAC Cooling Towers

Cooling Tower PP Drift eliminator Blade Type perform their function by causing droplets to switch direction and lose their velocity once the droplets hit the blade walls causing the droplets to fall back into the cooling tower. The most efficient cooling tower drift eliminators will keep your loss of drift to lower than 0.005% drift rate.

Blade cooling tower drift eliminators allow for rugged durability and a long life span because of their heavy gauge blades. These cooling tower eliminators are designed to be cost effective while providing adequate droplet capture to keep your process water in the cooling tower.

Advantages:

Low resistance to air

These cooling tower drift eliminators dramatically decrease drift losses while offering a low resistance to air.

Removable panels

This Cooling Tower Drift Eliminator has been assembled in removal parts that make its usage more convenient and servicing procedure easy.

Restrict biological growth

These drift eliminators have incorporated a built in material that helps avoid biological growth and also minimizes the risk of legionella.

Product Specification
 
Product Name  PVC Cooling Tower Louvers
Material PP.PVC
Delivery Time Delivery time 2 WEEKS
Used Cooling tower accessories

Product Show

Golden PP Grid Cooling Tower Fill Hamon FillerGolden PP Grid Cooling Tower Fill Hamon Filler

LATINO has an experienced team in quality and project implement to support the purchasing activities of overseas customers;The company's main products are cooling tower parts, such as Film Fill, drift eliminator and spray system, UPVC distribution pipes, FPR winding splash pipe, FRP profile parts,FRP gratings, Fan stack, band & clamp, etc.; Our product are approved by CTI and we have our own patent .

Golden PP Grid Cooling Tower Fill Hamon Filler
Our Company 

Tianjin LATINO Environmental Technology Co., Ltd. are on the base of high quality, good service, we win good reputation in the industry. We help our customers better to get cooling tower products from China.We specializes in manufacturing various cooling tower and parts. Our company's cooling tower products is being used widely around the world. Our business involve in Italy, Germany, Australia, UK, Indonesia, Thailand, Belgium, France, Poland, India, Malaysia, Singapore and New Zealand, etc..

Latino has a high quality team of talents. Team members are young and energetic, with a sense of innovation and the courage to meet the challenge.Team members develop and practice new e-marketing mode, follow consumer demand, provide customers with high quality products and services.

LATINO has an experienced team in quality and project implement to support the purchasing activities of overseas customers;The company's main products are cooling tower parts, such as Film Fill, drift eliminator and spray system, UPVC distribution pipes, FPR winding splash pipe, FRP profile parts,FRP gratings, Fan stack, band & clamp, etc.; Our product are approved by CTI and we have our own patent .
 
Our factory has the largest capacity and have been working with the recognized brands of cooling tower in around the world, our team have rich experience in oversea projects.we were your colleague, knowing your care, your culture and your requirements.So we make it easy for you to purchase high quality and good value internal plastic parts of cooling tower in China.

Our fill has been verified by actual operation for more than ten years. It is very reliable and efficient. You can rely on us to deliver a successful project while reducing your total project costs!

Golden PP Grid Cooling Tower Fill Hamon Filler

Golden PP Grid Cooling Tower Fill Hamon FillerGolden PP Grid Cooling Tower Fill Hamon Filler
FAQ
 
Q1. What's your Main Product ?
The company's main products are cooling tower and Cooling tower parts such as Film Fill, drift
 eliminator and spray system, UPVC distribution pipes, FPR winding splash pipe, FRP profile parts,
FRP gratings, Fan stack, band & clamp, etc


Q2:How to define the product price?
A: PVC cooling Tower  material is based on the thickness,vicat point, color, density,fire classification, packing and quantity.

Q3. Do you keep the stock of your products?
A: Yes, we maintain a certain amount of standard products inventory, in time to meet your needs.

Q4. Whether you have the ability to accept the product customization?
A: Products can be customized, we can make the new thermoforming or extruding mode based on your drawings and we can sign a confidentiality agreement about your patented product, pls contact us for any further information.

Q5: What's your delivery time ?
The delivery time normally will be 10 -30days , the specified delivery date will be according to customer request and order quantity .

Q6. How to reassure those who doubt the product quality and actual situations?
A professional system can ensure the whole latest development which will be monitored by you through the reports in the diffferent stages.

Q7.How about your after sale service?  
1. Warranty service
a).Warranty: 1 year.
b) .Warranty starting: acceptance date.  
2. Service commitment
Warranty period:
a). Our company will be responsible for the quality problems arising from the maintenance, replacement of parts and related materials.
b). Artificial damage will be repaired by our company, but the damaged devices shall be paid.
3. Expiration of the warranty period:
a). Our company provides lifelong maintenance, but the user is responsible for the cost of labor and material.
b). Our company also provides charging upgrades and improvements following to the customer's requirements.

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now