• Cooling Tower Fill Replacement/ Cooling Tower Maintenance
  • Cooling Tower Fill Replacement/ Cooling Tower Maintenance
  • Cooling Tower Fill Replacement/ Cooling Tower Maintenance
  • Cooling Tower Fill Replacement/ Cooling Tower Maintenance

Cooling Tower Fill Replacement/ Cooling Tower Maintenance

Cooling Method: Cross Flow
Ventilation Mode: Natural Ventilation
Material: PVC
Air Contact Form: Wet and Dry
Air Contact Way: Open
Tower Shape: Square
Samples:
US$ 0.9/Square Meter 1 Square Meter(Min.Order)
| Request Sample
Customization:
Diamond Member Since 2019

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company

Basic Info.

Noise Level
Ordinary
Application Fields
Industrial
Certification
ISO
Condition
New
Transport Package
Wooden Box
Specification
900/1220
Trademark
LATINO
Origin
China
HS Code
3926901000
Production Capacity
500 M3/Day

Product Description

Cooling Tower Fill Replacement/ Cooling Tower Maintenance

Cooling Tower Fill Replacement/ Cooling Tower Maintenance
  • Brand LATINO
  • Product origin CHINA
  • Delivery time 7 DAYS
  • Supply capacity 1000000 SQUARE METER PER DAY
Warranty:
All Latino's drift eliminators are under 1 year warranty when deliver from our factory.
 

Technical data for Cross Flow PVC Cooling Tower Fills:

Cooling Tower Fill provides sheets of material that are shaped into a corrugated pattern for the water to travel across. It can be combined and stacked into blocks, to create various thicknesses and heights to fit individual cooling towers.

 

The largest disadvantage of film fill is that it doesn't provide an opportunity for the water to redistribute itself. The initial water distribution at the top of the fill must be uniform, or the process won't work well. The close spacing created by the narrow passages of film fill also makes film fill more challenging to maintain. If the water includes large debris like leaves, the fill is prone to clogging.

Cross Cooling Tower PVC filling Material
Length Width Sheet thickness Pitch Distance Material Color
Customized 900mm 0.30mm to 0.60mm 18mm PVC Gray,Black

Features

Uses PVC material to guarantee longer lifespan

Easy maintenance

high temperatures resistant


Cooling Tower Fill Replacement/ Cooling Tower Maintenance
Relevant Cooling Tower Fill:


Cooling Tower Fill Replacement/ Cooling Tower Maintenance

LATINO has an experienced team in quality and project implement to support the purchasing activities of overseas customers;The company's main products are cooling tower parts, such as Film Fill, drift eliminator and spray system, UPVC distribution pipes, FPR winding splash pipe, FRP profile parts,FRP gratings, Fan stack, band & clamp, etc.; Our product are approved by CTI and we have our own patent .

Cooling Tower Fill Replacement/ Cooling Tower Maintenance

Our Company 

Tianjin LATINO Environmental Technology Co., Ltd. are on the base of high quality, good service, we win good reputation in the industry. We help our customers better to get cooling tower products from China.We specializes in manufacturing various cooling tower and parts. Our company's cooling tower products is being used widely around the world. Our business involve in Italy, Germany, Australia, UK, Indonesia, Thailand, Belgium, France, Poland, India, Malaysia, Singapore and New Zealand, etc..

Latino has a high quality team of talents. Team members are young and energetic, with a sense of innovation and the courage to meet the challenge.Team members develop and practice new e-marketing mode, follow consumer demand, provide customers with high quality products and services.

LATINO has an experienced team in quality and project implement to support the purchasing activities of overseas customers;The company's main products are cooling tower parts, such as Film Fill, drift eliminator and spray system, UPVC distribution pipes, FPR winding splash pipe, FRP profile parts,FRP gratings, Fan stack, band & clamp, etc.; Our product are approved by CTI and we have our own patent .
 
Our factory has the largest capacity and have been working with the recognized brands of cooling tower in around the world, our team have rich experience in oversea projects.we were your colleague, knowing your care, your culture and your requirements.So we make it easy for you to purchase high quality and good value internal plastic parts of cooling tower in China.

Our fill has been verified by actual operation for more than ten years. It is very reliable and efficient. You can rely on us to deliver a successful project while reducing your total project costs!
Cooling Tower Fill Replacement/ Cooling Tower Maintenance



Cooling Tower Fill Replacement/ Cooling Tower Maintenance
Cooling Tower Fill Replacement/ Cooling Tower MaintenanceCooling Tower Fill Replacement/ Cooling Tower Maintenance
FAQ
 
Q1. What's your Main Product ?
The company's main products are cooling tower and Cooling tower parts such as Film Fill, drift
 eliminator and spray system, UPVC distribution pipes, FPR winding splash pipe, FRP profile parts,
FRP gratings, Fan stack, band & clamp, etc


Q2:How to define the product price?
A: PVC cooling Tower  material is based on the thickness,vicat point, color, density,fire classification, packing and quantity.

Q3. Do you keep the stock of your products?
A: Yes, we maintain a certain amount of standard products inventory, in time to meet your needs.

Q4. Whether you have the ability to accept the product customization?
A: Products can be customized, we can make the new thermoforming or extruding mode based on your drawings and we can sign a confidentiality agreement about your patented product, pls contact us for any further information.

Q5: What's your delivery time ?
The delivery time normally will be 10 -30days , the specified delivery date will be according to customer request and order quantity .

Q6. How to reassure those who doubt the product quality and actual situations?
A professional system can ensure the whole latest development which will be monitored by you through the reports in the diffferent stages.

Q7.How about your after sale service?  
1. Warranty service
a).Warranty: 1 year.
b) .Warranty starting: acceptance date.  
2. Service commitment
Warranty period:
a). Our company will be responsible for the quality problems arising from the maintenance, replacement of parts and related materials.
b). Artificial damage will be repaired by our company, but the damaged devices shall be paid.
3. Expiration of the warranty period:
a). Our company provides lifelong maintenance, but the user is responsible for the cost of labor and material.
b). Our company also provides charging upgrades and improvements following to the customer's requirements.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now