• Mc75 Cooling Tower PVC Fills
  • Mc75 Cooling Tower PVC Fills
  • Mc75 Cooling Tower PVC Fills
  • Mc75 Cooling Tower PVC Fills
  • Mc75 Cooling Tower PVC Fills
  • Mc75 Cooling Tower PVC Fills

Mc75 Cooling Tower PVC Fills

Cooling Method: Counter Flow
Ventilation Mode: Natural Ventilation
Material: PVC/PP
Air Contact Form: Wet and Dry
Air Contact Way: Open
Tower Shape: Square
Samples:
US$ 0.9/Square Meter 1 Square Meter(Min.Order)
| Request Sample
Customization:
Diamond Member Since 2019

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company

Basic Info.

Model NO.
9624
Noise Level
Ordinary
Application Fields
Industrial
Certification
ISO
Condition
New
Transport Package
Wooden Box
Specification
Customized
Trademark
LATINO
Origin
China
HS Code
3926901000
Production Capacity
50000 M2/Day

Product Description

MC75 Cooling Tower Fill/ PVC Fills/ Infill for Marley Brand Cooling Tower

Marley MC75 is a film fill system designed for counterflow towers offering you several distinct advantages.

Crossed corrugations provide the surface area and turbulence to develop efficient heat transfer. The corrugations inherently establish uniform fill sheet spacing at 0.75.

MC75 fill is thermoformed from 0.015thick, UV inhibited, chemically-resistant polyvinyl chloride(PVC). The flame spread rating is less than 25 per ASTM E-84 and is considered self-extinguishing. The material is extruded and manufactured to rigid specifications before forming.

Using Marley MC75 film fill in place of existing splash type fill in counterflow towers usually means reduced fill height, which translates into reduced pumping head. MC75 will also provide greater cooling tower capacity, which means your current performance level will require less fan energy.

The fill pack depth(air travel) is variable to provide the proper heat transfer area within a single fill layer. If another layer of fill is necessary for situations where additional air travel is required, it will be limited to only one. Limiting the number of interfaces between packs minimizes restrictions that usually cause fill clogging.

Product Specification
 
Product Name Marley MC 75 Cooling Tower fill 
Material PVC,PP
Thickness  0.3-0.6
Color Black,Grey 
Type water cooling tower fill
Used Counterflow Cooling Tower


Mc75 Cooling Tower PVC Fills
Mc75 Cooling Tower PVC Fills

Mc75 Cooling Tower PVC Fills

LATINO has an experienced team in quality and project implement to support the purchasing activities of overseas customers;The company's main products are cooling tower parts, such as Film Fill, drift eliminator and spray system, UPVC distribution pipes, FPR winding splash pipe, FRP profile parts,FRP gratings, Fan stack, band & clamp, etc.; Our product are approved by CTI and we have our own patent .

Mc75 Cooling Tower PVC Fills
Our Company 

Tianjin LATINO Environmental Technology Co., Ltd. are on the base of high quality, good service, we win good reputation in the industry. We help our customers better to get cooling tower products from China.We specializes in manufacturing various cooling tower and parts. Our company's cooling tower products is being used widely around the world. Our business involve in Italy, Germany, Australia, UK, Indonesia, Thailand, Belgium, France, Poland, India, Malaysia, Singapore and New Zealand, etc..

Latino has a high quality team of talents. Team members are young and energetic, with a sense of innovation and the courage to meet the challenge.Team members develop and practice new e-marketing mode, follow consumer demand, provide customers with high quality products and services.

LATINO has an experienced team in quality and project implement to support the purchasing activities of overseas customers;The company's main products are cooling tower parts, such as Film Fill, drift eliminator and spray system, UPVC distribution pipes, FPR winding splash pipe, FRP profile parts,FRP gratings, Fan stack, band & clamp, etc.; Our product are approved by CTI and we have our own patent .
 
Our factory has the largest capacity and have been working with the recognized brands of cooling tower in around the world, our team have rich experience in oversea projects.we were your colleague, knowing your care, your culture and your requirements.So we make it easy for you to purchase high quality and good value internal plastic parts of cooling tower in China.

Our fill has been verified by actual operation for more than ten years. It is very reliable and efficient. You can rely on us to deliver a successful project while reducing your total project costs!
Mc75 Cooling Tower PVC Fills



Mc75 Cooling Tower PVC FillsMc75 Cooling Tower PVC Fills
FAQ
 
Q1. What's your Main Product ?
The company's main products are cooling tower and Cooling tower parts such as Film Fill, drift
 eliminator and spray system, UPVC distribution pipes, FPR winding splash pipe, FRP profile parts,
FRP gratings, Fan stack, band & clamp, etc


Q2:How to define the product price?
A: PVC cooling Tower  material is based on the thickness,vicat point, color, density,fire classification, packing and quantity.

Q3. Do you keep the stock of your products?
A: Yes, we maintain a certain amount of standard products inventory, in time to meet your needs.

Q4. Whether you have the ability to accept the product customization?
A: Products can be customized, we can make the new thermoforming or extruding mode based on your drawings and we can sign a confidentiality agreement about your patented product, pls contact us for any further information.

Q5: What's your delivery time ?
The delivery time normally will be 10 -30days , the specified delivery date will be according to customer request and order quantity .

Q6. How to reassure those who doubt the product quality and actual situations?
A professional system can ensure the whole latest development which will be monitored by you through the reports in the diffferent stages.

Q7.How about your after sale service?  
1. Warranty service
a).Warranty: 1 year.
b) .Warranty starting: acceptance date.  
2. Service commitment
Warranty period:
a). Our company will be responsible for the quality problems arising from the maintenance, replacement of parts and related materials.
b). Artificial damage will be repaired by our company, but the damaged devices shall be paid.
3. Expiration of the warranty period:
a). Our company provides lifelong maintenance, but the user is responsible for the cost of labor and material.
b). Our company also provides charging upgrades and improvements following to the customer's requirements.

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now